300ft Elevating Support Vessel
1. GENERAL SERVICE
1) The "300ft SEU" is a self-propelled jack-up unit designed and constructed for the well service work (wireline/well testing/pressure pump/cementing) and construction/maintenance for offshore oilfield;
2) The unit design also considers the wind turbine installation and maintenance;
3) The unit to have a deck area of about 970m2 and be able to be used as a living support vessel with living quarters;
4) The unit to contain four (4) main generators which can supply 4800kW power;
5) Two (2) cranes to be installed around the forward two legs and have max. 185t lifting capacity for offshore service.
2. GENERAL DESCRIPTION
Class
The vessel to be classed in ABS.
Hull Particulars
Length overall 49.20 m (161.4ft)
Length molded 46.80 m (153.5ft)
Breath molded 42.67m(140ft)
Depth molded 6.80 m (22.3ft)
Design draught 3.60 m (11.8ft)
Design speed 6.0 kn
Max.Jacking variable load 1100 t
Deck load 800 t
Service depth 5-50m(16.4-164ft)
Air gap 20m( 65.6ft)
Deck stress 4.8 t/m2
Main deck area >970 m2
Leg, Spud can and jacking system particulars
Leg configuration cylindrical with spline
Leg diameter 2.8 m(9.2ft)
Leg length (including spud can) 91.44m(300ft)
Spud can dimension 11.7 m×11.7 m(38.4ftx38.4ft)
Jacking system hydraulic
Jacking speed (under load) 1.22 m/min(4ft/min)
POB (total 47 persons)
Single cabins ×3 = 3 p
2-men cabins ×2 = 4 p
4-men cabins ×10 =40p
3. CONSTRUCTION PROGRESS (Until December, 2010)
The vessel is under construction by Weihai Marine and Resoureces Co. Ltd
1) Drawing Approval: the detailed design drawings have been approved by ABS;
2) Production: According to the schedule, the main hull to be completed at the end of 2010, and the vessel is scheduled to be delivered on Nov. 15, 2011;
3)Main Equipment Purchasing: the main equipments purchasing has been finished, such as ME, generators and so on.
300ft Elevating Support Vessel